Construction of the walls of an industrial hall is usually carried out already afterthe hall is covered with a roof. Windows and wall air intakes are then installed in the wall openings. Installation of the air intakes is usually done from the outside of the building, and in the case of flanged air intakes only from the outside.
The fastest way to install air intakes is to install them in the wall using a movable articulating platform. However, it should be noted that to date there are no platforms with certified equipment for gripping, transporting and installing wall louvers or similar objects. While such equipment can be made onone’s own, it is worthwhile to agree on the terms of installation with the services responsible for safety at the construction site.